{"id":27617,"date":"2026-05-09T03:28:09","date_gmt":"2026-05-09T02:28:09","guid":{"rendered":"http:\/\/news.pupers.net\/?p=27617"},"modified":"2026-05-09T03:28:09","modified_gmt":"2026-05-09T02:28:09","slug":"i-am-artemis-anton-kiriwas","status":"publish","type":"post","link":"http:\/\/news.pupers.net\/?p=27617","title":{"rendered":"I Am Artemis: Anton Kiriwas"},"content":{"rendered":"\n<p>\t\t\t\t\t\t\t3 Min Read<\/p>\n<p>\t\t\t\t\t\t\t\tI Am Artemis: Anton Kiriwas\t\t\t\t\t\t\t<\/p>\n<p>Listen to this audio excerpt from Anton Kiriwas, senior technical integration manager for NASA\u2019s Exploration Ground Systems Program:<\/p>\n<p>\t\t\t\t0:00 \/ 0:00<\/p>\n<p>\t\t\tYour browser does not support the audio element.<\/p>\n<p>When Anton Kiriwas first spotted an image of the Moon and Mars hanging over a job fair booth while in college, it captured his imagination, yet felt like a dream too distant to chase. He had no way of knowing that years later he would play a critical role in NASA\u2019s Artemis missions, helping launch humans back to the Moon for the first time in more than half a century.<\/p>\n<p>Kiriwas\u2019 journey to NASA began during the Space Shuttle Program, while he was working for United Launch Alliance, the same organization behind the memorable Moon and Mars booth that he passed by in college. Not long after, he joined NASA as a civil servant, designing electrical systems that set him on a path toward his current role with Exploration Ground Systems as senior technical integration manager. In simpler terms, Kiriwas is a problem solver.<\/p>\n<p>\t\t\t\t\tMy official title is way too long \u2013 what I do is pretty simple: I solve problems for the ground systems. Our goal is to process, launch, and recover the spacecraft. There are a lot of ground systems that are used to go do that and a lot of people involved. A big part of my job is to go solve all the problems that come.<\/p>\n<p>\t\t\t\t\t\tAnton Kiriwas<br \/>\n\t\t\t\t\t\tSenior Technical Integration Manager, Exploration Ground Systems Program<\/p>\n<p>A core part of Kiriwas\u2019s role is to serve as a launch project engineer. Strategically positioned at the integration console in the center of Firing Room 1 of the Launch Control Center at the agency\u2019s Kennedy Space Center in Florida, he acts as a bridge for the test management and engineering teams. Kiriwas, along with the other launch project engineers, reports directly to the launch director, making the final technical recommendation on any issues that may arise during launch countdown. From this seat, he works across all engineering disciplines, united under one mission: launch the spacecraft and crew safely.<\/p>\n<p>Anton Kiriwas, senior technical integration manager and senior launch project engineer with NASA\u2019s Exploration Ground Systems Program participates in an Artemis II launch countdown simulation inside Firing Room 1 in the Launch Control Center at the agency\u2019s Kennedy Space Center in Florida on Wednesday, Oct. 8, 2025. The simulations go through launch day scenarios to help launch team members test software and make adjustments if needed during countdown operations. NASA\/Glenn Benson<\/p>\n<p>Despite the intensity of launch day, Kiriwas describes it can often feel easier than the hundreds of rehearsals and simulations leading up to it. The team trains rigorously, preparing for every scenario imaginable. The ideal day is smooth and uneventful, but when it\u2019s not, he and the team are ready.<\/p>\n<p>\t\t\t\t\tI\u2019m in my element when there is a problem.<\/p>\n<p>\t\t\t\t\t\tAnton Kiriwas<br \/>\n\t\t\t\t\t\tSenior Technical Integration Manager, Exploration Ground Systems Program<\/p>\n<p>When an issue arises, Kiriwas and his team begin asking the basic questions: \u2018What are the requirements? Which systems are affected? Who needs to be involved?\u2019 He pulls the technical community together to work through the situation, come up with any troubleshooting, and ultimately give the recommendation for a \u201cgo\u201d or \u201cno-go\u201d for launch. It takes clarity, experience, and discipline, especially in moments when excitement is running high.<\/p>\n<p>\u201cThere is adrenaline to get to launch, but you want to be careful to never let that turn into \u2018launch fever,\u2019\u201d said Kiriwas. \u201cWe need to launch exactly when we\u2019re ready and not a moment before.\u201d<\/p>\n<p>Anton Kiriwas, a launch project engineer for the Artemis I mission, monitors operations from his position in Firing Room 1 as Artemis teams conduct a launch simulation for the Artemis I launch inside the Rocco A. Petrone Launch Control Center at NASA\u2019s Kennedy Space Center in Florida on Oct. 27, 2022. NASA\/Ben Smegelsky<\/p>\n<p>With Artemis II complete, Kiriwas continues applying his problem\u2011solving expertise, analyzing lessons learned, and shaping future mission requirements. Artemis III hardware is currently being processed at NASA Kennedy, and the teams are carefully preparing the next steps of NASA\u2019s return to the lunar surface.<\/p>\n<p>\u201cThere\u2019s a million little pieces that go into this, and I get to be a part of it,\u201d said Kiriwas.<\/p>\n<p>About the AuthorLaura SasaninejadStrategic Communications Specialist<\/p>\n<p>\t\t\t\t\tShare<\/p>\n<p>\t\t\t\t\tDetails<\/p>\n<p>\t\t\t\t\t\tLast Updated<\/p>\n<p>\t\t\t\t\tMay 08, 2026<\/p>\n<p>\t\t\tEditorJason CostaLocationKennedy Space Center\t\t\t<\/p>\n<p>\tRelated TermsArtemisArtemis 1Artemis 2Exploration Ground SystemsI Am ArtemisKennedy Space Center<\/p>\n<p>\t\t\t\tExplore More<\/p>\n<p>\t\t\t\t\t\t\t\t4 min read<br \/>\n\t\t\t\t\t\t\t\tNASA Fuel Cell Tests Pave Way for Energy Storage on Moon<\/p>\n<p>\t\t\t\t\t\t\t\t\t\tArticle<\/p>\n<p>\t\t\t\t\t\t\t\t\t\t12 hours ago\t\t\t\t\t\t\t\t\t<\/p>\n<p>\t\t\t\t\t\t\t\t3 min read<br \/>\n\t\t\t\t\t\t\t\tNASA Welcomes Paraguay as 67th Artemis Accords Signatory<\/p>\n<p>\t\t\t\t\t\t\t\t\t\tArticle<\/p>\n<p>\t\t\t\t\t\t\t\t\t\t1 day ago\t\t\t\t\t\t\t\t\t<\/p>\n<p>\t\t\t\t\t\t\t\t3 min read<br \/>\n\t\t\t\t\t\t\t\tIndustry Moon Lander Training Cabin Lands at NASA for Artemis<\/p>\n<p>\t\t\t\t\t\t\t\t\t\tArticle<\/p>\n<p>\t\t\t\t\t\t\t\t\t\t1 day ago\t\t\t\t\t\t\t\t\t<\/p>\n<p>\t\t\t\t\tKeep Exploring<br \/>\n\t\t\t\t\tDiscover More Topics From NASA<\/p>\n<p>\t\t\t\t\t\t\t\tMissions<\/p>\n<p>\t\t\t\t\t\t\t\tHumans in Space<\/p>\n<p>\t\t\t\t\t\t\t\tClimate Change<\/p>\n<p>\t\t\t\t\t\t\t\tSolar System<\/p>\n","protected":false},"excerpt":{"rendered":"<p>3 Min Read I Am Artemis: Anton Kiriwas Listen to this audio excerpt from Anton Kiriwas, senior technical integration manager for NASA\u2019s Exploration Ground Systems Program: 0:00 \/ 0:00 Your browser does not support the audio element. When Anton Kiriwas first spotted an image of the Moon and Mars hanging over a job fair booth [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":27618,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[126,2682,660,906,128,30,11,9],"tags":[32],"class_list":["post-27617","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-artemis","category-artemis-1","category-artemis-2","category-exploration-ground-systems","category-i-am-artemis","category-kennedy-space-center","category-nasa","category-science","tag-en"],"acf":[],"_links":{"self":[{"href":"http:\/\/news.pupers.net\/index.php?rest_route=\/wp\/v2\/posts\/27617","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/news.pupers.net\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/news.pupers.net\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/news.pupers.net\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/news.pupers.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=27617"}],"version-history":[{"count":0,"href":"http:\/\/news.pupers.net\/index.php?rest_route=\/wp\/v2\/posts\/27617\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/news.pupers.net\/index.php?rest_route=\/wp\/v2\/media\/27618"}],"wp:attachment":[{"href":"http:\/\/news.pupers.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=27617"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/news.pupers.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=27617"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/news.pupers.net\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=27617"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}